Hi All
Just to let you all know what is going on, I have been a little busy dealing with a mates estate, long story, lots of work, FA personal time!
Anyway, we have some good news, the Pilbara cabs finally arrived, I have been collecting some Atlas Dash-8s with sound. So this will be a great little project making some CM39-8 and CM40-8.
We also had a successful operating session, Dave, Roger John and Katie, thanks all was great.
We issued four train orders, thanks to Glen for the orders.
We only did one 347 and half assembled 166.
Here is 166, ready for consisting.
DL39 on the Ghan and AN4 on 166 in the Barcoola storage sidings.
Here is a modern image project an ALF body from Dave Luketic modified to accept a CL mechanism, should be another project.
Enjoy
Scott
A site for my Model Railway Layouts: Barcoola. This is take on Tarcoola SA the junction between the Trans Australian Railway and the Central Australian Railway. A Town like Alice, my take on Alice Springs. Murray River Bridge, my model of the bridge over the Murray river.
Monday, November 24, 2014
Wednesday, November 5, 2014
the 2014 drink drive world tour final
Hi All
Here is a selection of the last couple of shots from the 2014 drink drive world tour. thanks to Dave, Doug and Glen, nice work guys it was a blast!
This Freightliner job was on a mission, doing line speed at every chance.
Enjoy Scott
Here is a selection of the last couple of shots from the 2014 drink drive world tour. thanks to Dave, Doug and Glen, nice work guys it was a blast!
This Freightliner job was on a mission, doing line speed at every chance.
Enjoy Scott
Subscribe to:
Posts (Atom)