Friday, January 25, 2013

Alice Springs progress 24jan2013

Hi All

Here are some shots of Alice Springs and the current progress, Doug dropped in on his AL, and spent and afternoon painting the base coat of scenery paint.  The colour might look a bit extreme, but I used the same process with Barcoola, so it works.
I have laid the mainline south to Bow River, using Micro Engineering code 83 concrete.  The mainline is raised with 3 mm cork.



This shows the drain before the gap.


Temporary trackage.


The location for the Bow River bridge


Enjoy

Scott

Sunday, January 13, 2013

Alice Springs now operational, plus road and hard stand bases added

Hi All

Here is some pictures of Alice Springs in operational condition.
Doug came around and helped out with the laying down of the roads and the hard stand areas.

CLF4 and CLF1 about to depart Alice Springs.

The home stick is in place, and the base for Larapinta Drive is 

The Turntable area almost complete, the hard stand area is also down.

The end loading roads.

To add a bit more animation, I have added a Fuller vehicle system, but testing is first.

The Fuller vehicle road system temporarily in place, for testing.

The NTFS depot.

Access road at the west end of the yard.

The loop for the Fuller Vehicle system at the end of the Gantry road.

EL53 and GM30 rest at the loco sidings

The truck as is, that you get with the starter kit.

The temporary staging sidings.

Its been good to operate the yard as intended, and all that research as paid off, Train lengths are a respectable 19ft clear, the yard works as intended, no surprises.  With the base of the roads and hard stand areas down, its all starting to take shape.

Next is to weather all the sleepers and track, so that I can start on the base scenery.
Thanks to Doug for help with the the roads.

Enjoy

Scott

Wednesday, January 2, 2013

Auscision has announced the GT46ACe GWA class in HO

Hi All

Auscision has announced the GT46ACe, in PN LDP, QRN and GWA liveries.
The GWA class will round out Alice Springs Ultra modern quite nicely.

For the record, here is a shot of Glen's of GWA 001, a VL and a CLF at I think, Wirrida.



They are offering:
GWA Class (Genesee Wyoming Australia)

For Barcoola there is the QRN LDP:

LDP Class (QR National)



Enjoy

Scott

Tuesday, January 1, 2013

All is not quiet at Alice Springs on New Year's Day

Hi All

All is not quiet at Alice Springs yard on New Year's Day.  With a concerted work program in force, Alice Springs yard is  now operational.  There was no wiring hicups, got it spot on first time.
I have elected to put some temporary "fiddle yard" tracks in, so that I can start experimenting with operations.
However I am not a big fan of operating naked boards, I would like to start roughing in the scenery around the yard.  Starting with things like.
The hard stand area.
Setting the Fuller track system into the yard roads.
Main roads and level crossings.
Establish the foot prints for major buildings etc.

So the year has started off with a great leap forward for Alice Springs.  I will post some of the operations at a later date.

If you are after some interesting summer reading, the latest issue of Australian Railways Illustrated, issue 17 has an article on AN's Westliner AP5, well worth the purchase, for some reason you will need to look for the issue with a blue 81 class on the front cover, I would have thought a DL CL, CL standard combination on the Westliner would have been a little more appropriate, but hey its not my mag...

Anyway, Enjoy

Scott

Wednesday, December 26, 2012

Trainorama GM class first pre production images

Hi All

Here are some images from Trainorama of the pre production GM class models, you can still see the quality.  For the full story check out the link and go down to "GM Class Monday 17th December 2012" .



We await the final examples, and will be a welcome addition to Barcoola and Alice Springs, suitably faded of course!

Enjoy

Scott

Monday, December 24, 2012

Barcoola Season Greetings

Hi All

I would like to wish all a Merry Christmas and Season Greeting on behalf of the Barcoola crew.

This year has brought a lot of changes, and re focusing of priorities.
On the plus side I actually have managed to wangle annual leave over the Chirstmas - new year period, so there will be a big push for getting Alice Springs to a presentable stage, and enable operations to start.

I have also been taking stock of what I really want to achieve with building layouts.  A number of layouts have been scratched off the list for now.
This includes:
A Layout based on AN's southline.
A layout based on Broken Hill.
A layout based on BCRail.
A layout based on the Lincoln Division.

Most of this equipment has ended up on Ebay, so if you are interested check out Jason's ebay listings you never know, you might bag a bargain, anyway enough of the self promotion.

The refocusing has illustrated to me, the need to get things done in a certain way.  Lance Mindhiem has a lot of info on his site explaining how doing more with less can work, for example the industrial area of Alice Springs was up and running in about 6 months, amongst heavy work commitments, thus getting a small section of the layout up and running early keeps the will power going.  I expect phase II of Alice Springs to be operational real soon now, thus in little over a year. Doing the same on Barcoola using older building techniques took about three years.

So if I was giving tips on Layout project management, here is what I would be looking at.

  • What are you really passionate about? What would you really like to model?  Then take it down to 80 to 60% and you are probably there.
  • Assess your available space, complicated arrangement's just to get millimetres of space are just not worth it.
  • look at 30 inch aisle access for a one person operation 3 feet or more with pinch points for more than one operator.  I learn this the hard way with the Alice Springs industrial area, I have built this down to 24 inches, and I wish I had calculated in an extra 6 inches just for comfort.  Check out the link on Lance's site, in regard to design and space.
  • Available time and passion for what you want to do, taking a smaller bite of the pie, and doing it well is alot more satisfying, again check out a reference to lance's site regarding this.
  • The more real estate you have the more you need to detail it, On Alice Springs some sections are down to 300mm, if I had kept it all at 600mm wide then I would have twice the scenery work to do, thus would take twice a long to finish.
  • DCC makes wiring easy, and thus save time.  If you have not used DCC before, have a look at NCE, simply for user friendly functions, plus its available in wireless, thus you can get away without control panels.  If you are running a layout which trains are run by one locomotive, have a look at a complete wireless system, and the locomotives working batteries only.  I would definitely look at this type of operation for WA S scale.
  • Enjoy the planning stage, paper is cheep, but keep in mind the following, space between tracks for your fingers. in HO leave 300mm of 1 ft for each point.  Try not to go under 30 inch radi for HO mainline for layouts with modern rollingstock.

What's in store in 2013:
Alice Springs.
For the new year we will be completing Phase II.
Starting and experimenting with operations, train orders, TC12's TIMS printouts, shunting lists.
I will be looking at three eras for Alice Springs.
  • AN Transition Era (ALs BLs CLs DL's and GMs 1987-1988 still some locomotives in ANR and CR), 
  • AN 1993 (AN, CLF, CLP DL, ELs GMs, roadrailers and double stacks) 
  • GWI ultra modern - now (CLFs, CLPs GWIs, GWUs, GMs ANs and NRs) and no Glen I will not be removing the signals at the south end of the yard!
Jon is intending to build a layout, which is currently in the design stage.
Maybe even a Pilbara layout, on the small scale.

Anyway enjoy your time off with family and friends.

Scott





Sunday, December 23, 2012

Barcoola modeling links updated

Hi All

I have updated the modeling links to include:
A great site for Lincoln Division Prototype info, includes rolling stock histories.
Minnipa was featured in the October 2012 AMRM, an example of taking a manageable slice of the prototype, and a great design technique to increase the distance between stations.
Some great scenery techniques, at the Model Railway Hobbyist e magazine
Although highly focused, some great examples of modeling SA can be found at this site and CR and even AN modeling is tolerated.
A handy link to an update Pilbara railway map.
Toad's Pilbara Railways site, the only on I know of that is dedicated to the WA's North West.


Enjoy

Scott