Friday, January 25, 2013

Alice Springs progress 24jan2013

Hi All

Here are some shots of Alice Springs and the current progress, Doug dropped in on his AL, and spent and afternoon painting the base coat of scenery paint.  The colour might look a bit extreme, but I used the same process with Barcoola, so it works.
I have laid the mainline south to Bow River, using Micro Engineering code 83 concrete.  The mainline is raised with 3 mm cork.



This shows the drain before the gap.


Temporary trackage.


The location for the Bow River bridge


Enjoy

Scott

1 comment: