This was a little stunted, as I had more than one thing to accomplish.
However I managed to complete the frames for boards 10 and 11, thus now all complete.
I had to run down to Bunnings for some more 3mm and 6mm MDF, and 12mm ply.
However my Local Bunning store is fairly lousy in maintaining stock in certain items, and getting them ordered in, Well, I have to be honest that almost never works.

So I got on to the Ipad and did some searching, and as luck would have it, I found a mob in SA willing to supply the amount I needed, and had them in stock.
When they arrived on the front door on Saturday, three days after I ordered them, I was most impressed.

Check out, https://elraco.com.au/index.php/tee-nuts-c-24_102_108

And case catches https://elraco.com.au/product_info.php/case-catch-70x40mm-nickel-plated-p-7611