Wednesday, December 21, 2011

Alice industrial area part 2

Hi All

Some more progress pictures


The trackage was all roughed out before final cutting of track and application of adheasive.

The track in the forground is the Caltex siding, behind that is the Mobil siding.

The drain was replicated in foam, with the base of 30mm foam, then the colverts were cut in using a sharp stanley knife.










The wiring can be seen feeding through the foam base.


Thanks


Scott






No comments:

Post a Comment