Friday, June 21, 2019

Murray River Bridge Model Railway Layout Changes

Hi All

I decided to make some changes to board number 1, modify the tunnel and add the Pub.  Fred from Orient Express was the instigator of these changes, it his fault! 
Here is a consolidated look at the changes that have been made to Murray River Bridge, these debuted the Adelaide Model Railway Exhibition 2019:

Parts 1


Part 2



Part 3



Part 4

Doing the roads!



Part 5

Almost complete



Current configuration. Apologies for the camera shake, its really hard to get good shots of your own layout at the Adelaide exhibition.



Enjoy

Scott

No comments:

Post a Comment