Wednesday, June 21, 2017

Murray River Bridge new layout construction day 12.5

Hi All

Chances for a full day of work on Murray River Bridge have been hard to come by, but I have managed to get the most difficult part of the job done.  The pylons are in place and the c channel has been place in the correct location.  All the braces have been attached, which will stop any possible warping of the base.

What's left is the straight sections and that should not be as difficult.

Check out the youtupe video.

Enjoy Scott

No comments:

Post a Comment