A site for my Model Railway Layouts: Barcoola. This is take on Tarcoola SA the junction between the Trans Australian Railway and the Central Australian Railway. A Town like Alice, my take on Alice Springs. Murray River Bridge, my model of the bridge over the Murray river.
Saturday, February 25, 2012
New SCT depot in Direk SA, stacks of Modeling potential
I have been near maping, different locations. however the new SCT depot in Direk SA, is a very interesting prospect.
Given that the PBGY has been released by Railmotor models and the ABFX is also due soon from Ausicion.
Who would have thought that in 2012, we would have a new yard built with a two stall engine shed, hard stand area and goods shed (to be built).
Even better there is a convenient view block at the end of the yard in the form of the M20, over pass.
Operating potential is even better, given that all east west SCT trains to and from Melbourne and Perth, would eventually be visiting this yard. Including all the ore trains, which are split here for unloading at outer harbour.
Below are a couple of links to near map
An over all view of the yard.
http://www.nearmap.com/?ll=-34.698314,138.59592&z=16&t=n&nmd=20120114
A close up of the engine shed
http://www.nearmap.com/?ll=-34.695032,138.591067&z=19&t=n&nmd=20120114
The hard stand area.
http://www.nearmap.com/?ll=-34.701765,138.598309&z=19&t=n&nmd=20120114
The site for the goods shed.
http://www.nearmap.com/?ll=-34.703571,138.600388&z=18&t=w&nmd=20120114
A photo of the Yard from the M20 looking south.
http://railgallery.wongm.com/albums/freight-around-adelaide/E112_4777.jpg
I know Glen is working on some of the SCT specialist wagons, it might be something to a least look at for ultra modern.
Enjoy
Scott
Sadliers new depot in Spotswood Vic
GregM from Adelaide has posted that the new Sadliers depot, is a modeling gem, and I have to agree. Nestled between Melbourne Road and the reclamation depot. There are three tracks, going to a northern dead end, with a double set of cross overs at the stub end. Interesting that all the trackage in the depot, is asphalted.
Please click on the link, from Near Map.
http://www.nearmap.com/?ll=-37.834336,144.882776&z=18&t=e&nmd=20120122
I also like the fade pattern that the NLKY's are getting, and the rust on the roof, I am sure that will make Glen happy, for the ultra modern project.
See this link:
http://www.nearmap.com/?ll=-37.834198,144.883152&z=19&t=n&nmd=20120122
Heres a shot of NR35 shunting the depot.
http://www.railpictures.net/viewphoto.php?id=388634&nseq=16
T379 doing a transfer job.
http://www.railpictures.net/viewphoto.php?id=388632&nseq=17
Thanks
Scott
RQYY info for Lindsay
Alice Springs industrial area operational
Last weekend I managed to complete the wiring of the industrial area. So I have been busy operating. This area is basically it's own little layout within another layout.
Just to position wagons in the area, it took 1 and a half hours.
Here's a picture of the whole area, from Right to Left, Golden North Dairies, The three green tankers are at BP's siding. The two small tankers are at Caltex siding. The Three Mobil tankers are at Sabadin's siding. A tanker is a Kleen Gas, the coil wagons (these wagons won't be used in the finished layout) at the steel distribution siding, next is Adelaide Brighton Cement.
Further around the corner, is the NTFS siding which goes right through the their yard, crosses Ghan Road and into another Freight Forwarders yard.
Given the amount of work involved in this area of the yard, I think there is the capacity for two full time shunters in this layout.
I will post a day in the operational life of the industrial area soon.
Thanks
Scott
Sunday, February 12, 2012
A town like Alice the current plan
Hi AllHere the curent font runner.
This plan has the following features:
Walk in gate.
The traffic in the yard area is greatly reduced.
Open fiddle yard, no access problems.
The Gap can be a tall has it needs to be, and hides the rest of the layout from initial viewers.
Modified industrial area, with a new location for the NTFS depot.
The down side, reduced distance between sidings.
Let me know what you think
Anyway, the industrial area is almost completely wired ready for initial ops and then start the scenery.
Scott
The many doddle plans of Alice Springs
Fiddle yard hidden by a low back drop.
Only assess is via the GAP and this will have at least 2 ft high mountains on it.
Then there is the current one.
Thursday, February 2, 2012
SAR OB wagon addtional info, with follow up AGGY
Hi AllAddtional info, I knew I had a shot of a AGGY, generator car, in operation. Above is an AGGY in the middle of a P&O train in 2005, this wagon was used as power for Fridge boxes. Note that one end has be gas axed, so ease of acess to cable conections. Glen tells me that there is still one in operation, and is used for providing power on work trains.
I purchased the first issue of Australian Model Railway Magazine in some time, with the February 2012 issue.
I wanted to read Phil's article on the SAR OB wagon. The only disappointing aspect was that there were no shots post 1985.
Anyway we would like to add the following.




